This renovation project is our first project in collaboration with foreigners. Therefore, we demonstrated that our build standards are very good.

The work on this project began with the construction of a concrete table finished with bright pink exposed plaster cement and granite tiles measuring 60×120 cm for the top finish.

The next work is to rearrange the light points, outlet points according to the owner’s needs both on the ground floor, in the back room which functions as the kitchen and also the 2nd floor which will later function as a meeting room.

Another thing that stands out from this project is the pink kitchen set. We made the kitchen set in our furniture workshop.

Other basic work is installing ceilings, repairing damaged walls, painting the outer walls using waterproofing paint and painting the inner walls using quality paint accompanied by good and correct application.

The duration of this project construction is 1.5 months.

Add Your Comment

Main office

Jl. Tukad Badung XVIII C, Renon, Denpasar

Furniture Workshop

Jl. Tukad Badung XIXB No.3, Renon, Denpasar, Bali

Stay Tuned for updates

Basudeva Group © 2026. All Rights Reserved.